Main Page Sitemap

Facility inspection field manual pdf


facility inspection field manual pdf

As much as possible, these should be infinity fx35 owners manual located out of the way of potential vehicle collisions.
Workers should wear goggles, protective clothing, rubber gloves, and cracked arcade bowling 1.4 ipa petroleum jelly on exposed body parts and should be equipped with appropriate respirators to avoid hazardous fumes.
Like all high quality products, bridge coatings require adequate specifications, high quality materials, proper usage and maintenance of equipment, and last, but not least, effective inspection.
Given that most of today's bridge-paint work is being done on existing steel, this manual is geared toward people working in the field on existing steel.This pressure will be lower than that measured at the air supply due to loss in the hose.Different paints have different mixing requirements.Each reading should be not less than 80 of the specified thickness nor greater than 150 of the specified thickness.Iaaf Technical Delegates Guidelines, pDF.Remember that, as the inspector, it is your job window media player 11 for windows 8 to ensure that the contractor is doing a conscientious job of achieving the standard in all areas, but the progress of the job and reasonable demands on the contractor must be considered as well.En, iAAF Track and Field Facilities Manual 2008 Edition - Chapters 4-8, pDF.SP-11 - SP-11 denotes power tool cleaning to bare metal.
How important is this really?" In the case of bridge coatings, the importance of inspections and the role of a motivated inspector cannot be overstated.
All high pressure air supplies and devices should be gaged for easy reading.
Mike Praul, construction Materials Engineer, maine Division.
You may need to refer back to the text of the Manual for additional information.
Leave the lead hazards on the jobsite.To check, drop some of it into deionized water and shake.If cited in your Specification, you may be provided with a set of visual standards from either the National Association of Corrosion Engineers (nace) or the Society for Protective Coatings (sspc) to aid in this effort.Things will go much smoother if everyone has a clear understanding of what is expected right from the beginning.When repainting an existing structure, the Specifications may call for SP-2 or SP-3 in areas of limited accessibility.Suggested control points are: After a water blast and SP-1 cleaning After the completion of surface preparation After individual paint coating applications Discuss control areas where work must be approved prior to work being initiated in the next area.This is generally not a good idea because these trailers tend to get very hot during the summer and have limited ventilation.If the barrels are stored on site (remember the 90-day requirement they should be clearly marked as containing hazardous waste.Components of a Containment System Support Structure - Containments can be scaffolded from the ground or rigged to hang from the bridge structure.This level of cleaning is costly and is rarely specified for use on bridges.Look for signs of aging listed above.You may face a situation where the paint has exceeded its shelf life and still appears to be usable with none of the above-mentioned problems.




Sitemap